Process

What to expect, in order

The same six steps on a bedroom and on a whole house.

Painting is planned work, so most of what matters happens before and after the days with a brush in hand. Here is the order, and who is on site at each step.

Six steps

From first call to handover

  1. 01

    Step 1: Your message

    Tell us the address, the rooms and who else is on the project. A project lead replies in office hours.

  2. 02

    Step 2: Walkthrough

    The lead walks every surface, notes repairs, asks about colors and sheens, and tells you what is outside our work.

  3. 03

    Step 3: Written proposal

    Surfaces, preparation, coats, products, sheens, schedule and exclusions. You can read it against the drawings.

  4. 04

    Step 4: Sample board

    Colors are put on a board or on the wall and looked at in the room's own light. Nothing is ordered before you approve them.

  5. 05

    Step 5: The work

    Protection goes down, repairs are made, surfaces are primed and sanded and the finish coats go on. The lead is on site each day.

  6. 06

    Step 6: Handover

    A walk-through with you, a touch-up list, and a final clean.

Your part

What we ask of you

  • Before the walkthrough

    • The colors, or the designer's name

    • Which rooms and which surfaces

    • Any date you need us to meet

  • Before the work

    • Valuables and breakables out of the rooms

    • Access and parking for the crew

    • A decision on each color on the board

  • At handover

    • Time to walk each room

    • A list of anything you want touched up

    • Care instructions for the new finish

If something is found

When the wall says something else

Opened walls and old paint sometimes change the job.

When the wall says something else
What we don't doWhat we do
Repairs found laterWhat we don't doPaint over it and hopeWhat we doStop, show you, and write the change down before we continue
Extra colorsWhat we don't doAdded to the invoiceWhat we doAdded to the proposal, in writing
Older housesWhat we don't doSkip the testing and the containmentWhat we doFollow the lead rules for homes built before 1978

Questions

About the process

How long will it take?

We give day ranges in the proposal, by room or by area. We don't promise a date before the walkthrough.

What is not in the proposal?

Repairs found only once a surface is opened, and colors added after the sample board is approved. Both are written up before work continues.

Who is on site each day?

A named lead and the crew for that area. The lead's number is on your proposal.

Start with a walkthrough

Tell us about the house and we will set a time.