What to expect, in order
The same six steps on a bedroom and on a whole house.
Painting is planned work, so most of what matters happens before and after the days with a brush in hand. Here is the order, and who is on site at each step.
Six steps
From first call to handover
- 01
Step 1: Your message
Tell us the address, the rooms and who else is on the project. A project lead replies in office hours.
- 02
Step 2: Walkthrough
The lead walks every surface, notes repairs, asks about colors and sheens, and tells you what is outside our work.
- 03
Step 3: Written proposal
Surfaces, preparation, coats, products, sheens, schedule and exclusions. You can read it against the drawings.
- 04
Step 4: Sample board
Colors are put on a board or on the wall and looked at in the room's own light. Nothing is ordered before you approve them.
- 05
Step 5: The work
Protection goes down, repairs are made, surfaces are primed and sanded and the finish coats go on. The lead is on site each day.
- 06
Step 6: Handover
A walk-through with you, a touch-up list, and a final clean.
Your part
What we ask of you
Before the walkthrough
The colors, or the designer's name
Which rooms and which surfaces
Any date you need us to meet
Before the work
Valuables and breakables out of the rooms
Access and parking for the crew
A decision on each color on the board
At handover
Time to walk each room
A list of anything you want touched up
Care instructions for the new finish
If something is found
When the wall says something else
Opened walls and old paint sometimes change the job.
| What we don't do | What we do | |
|---|---|---|
| Repairs found later | What we don't doPaint over it and hope | What we doStop, show you, and write the change down before we continue |
| Extra colors | What we don't doAdded to the invoice | What we doAdded to the proposal, in writing |
| Older houses | What we don't doSkip the testing and the containment | What we doFollow the lead rules for homes built before 1978 |
Questions
About the process
How long will it take?
We give day ranges in the proposal, by room or by area. We don't promise a date before the walkthrough.
What is not in the proposal?
Repairs found only once a surface is opened, and colors added after the sample board is approved. Both are written up before work continues.
Who is on site each day?
A named lead and the crew for that area. The lead's number is on your proposal.