Skip to content
Home improvement contractor registration · CT Lic. 000000Verify(203) 555-0100

The studio

A finishing studio, led from the paint shop

Three crews, one shop on Lewis Street and a short list of things we will not do.

Jiyoung Kang started the studio as a finisher, and still leads finishing on every project. She sets the standard for preparation: a surface is not ready until she says it is.

The studio paints houses for homeowners, and works for designers, architects and builders on the finishes they specify. We would rather take fewer projects and finish each one properly.

Who leads

The people you will speak to

  • Jiyoung Kang

    Founder and head of finishing

    Leads finishing on every project and signs off the preparation before paint goes on.

  • Pedro Samaniego

    Production director

    Schedules the three crews and is on site at the start and end of each project.

  • Wendell Grant

    Trade accounts and estimating

    Reads the drawings, walks the site and writes the proposals for designers, architects and builders.

How we work

Four habits on every project

  • Preparation first

    Most of the time on a job is spent before the finish coat.

  • Samples before orders

    You approve a color on the wall before we buy a gallon.

  • One lead, named

    The same person walks the site at the start and at handover.

  • Clean at the end of each day

    Floors swept, tools put away, doors closed.

Talk to the studio

Tell us about the house or the project.